Home
© 2023 Connell Contractors. All Rights Reserved. Website by Point B
Pipe depths are up to 5 metres with ground water at 2 metres below surface level.
Installation of a 500-metre long triple 1.8m diameter concrete pipeline taking stormwater from the Mount Maunganui industrial area through the Port of Tauranga. Construction includes a sheetpiled outfall to the Tauranga Harbour shipping channel, a pipe jack under an internal port road and railway line, the relocation of existing services(high tension power cables, gas lines, BST fuel lines) in engineered ducts and two major intersection crossings.