Home
© 2023 Connell Contractors. All Rights Reserved. Website by Point B
The site was dewatered to allow the construction of a coffer dam, the upgrade of inlet bays and platforms, replacement of the inlet screens, installation of a new outlet structure to the existing headwall, replacement of increased size pipework and reinstatement of the stopbank.
This contract was located on the banks of the Waikato River at Otaua.
Due to the close proximity to a significant waterway strict environmental controls were in place.